Building & Development Contact Info

Steven M. Myers, P.E.
Director of Building & Zoning

phone icon (518) 371-6702
fax icon (518) 383-2668
email icon Email
map icon 1 Town Hall Plaza
       Clifton Park, NY 12065

 

 

Staff

Derek P. Miller – Senior Building Inspector
Mark S. Kazmierczak – Assistant Building Inspector
Robert Adams – Code Enforcement Officer
Samuel C. Chase – Code Enforcement Officer
Patrick J. Jarosz – Code Enforcement Officer
Wade Schoenborn – Code Enforcement Officer
Cristi Shuhart – Principal Typist
Kathy Boni – Senior Account Clerk


Office Hours

Monday - Friday
8:00am - 5:00pm

 

building MapBuilding Permit & Application Information

FOR ALL PERMITS WHICH REQUIRE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 

It is the responsibility of the applicant that the Building Department receive written approval from the following individuals, agencies, and/or departments prior to occupancy of structure.

  1. Final electrical inspection by an authorized inspection agency.
  2. Final inspection letter submitted to the Building Department prior to backfilling of "special" septic systems.
  3. Surveyed as-built plot plan submitted to the Building Department.
  4. Final inspection by the Fire Code Enforcement Officer of fireplaces, woodstoves, furnaces, water heaters, or other heat-producing equipment.
  5. Final inspection by the Building Department when building is completed.

The Building Department will issue a Certificate of Occupancy to an applicant when all the above items have been completed.

IT IS ILLEGAL TO OCCUPY ANY BUILDING WITHOUT A CERTIFICATE OF OCCUPANCY (IN VIOLATION OF THE CODE OF THE TOWN OF CLIFTON PARK ZONING REGULATIONS SECTION 208-108).

Under normal circumstances, your Certificate of Occupancy document will be prepared within forty-eight (48) hours after completion of all of the above. 

Please be advised that inspections must also be called for at the following intervals:

  1. Footings before pour.
  2. Foundation after waterproofing, but before backfill.
  3. Sewer/septic and water installation (before backfill).
  4. Rough frame including plumbing, wiring, and heating, but without insulation.
  5. Insulation before sheetrock.
  6. Fireplace inspections as required by Fire Code Enforcement Officer.
  7. Furnace, water heater, or other heat-producing equipment.
  8. Final inspection.

A TWENTY-FOUR HOUR NOTICE IS REQUIRED TO SCHEDULE ALL INSPECTIONS. 

For Permit Fees, click here, or call Building & Development at: (518) 371-6702

 

Report Missing Pet

Facebook Icon Button

youtube icon button

Recent Town Documents

Upcoming Events

19 May 2017;
11:00AM - 12:00PM
Diabetes Workshop
19 May 2017;
01:00PM - 02:00PM
Orchestra Concert
22 May 2017;
10:00AM - 12:00PM
Bocce

Contact Us - 518-371-6651



1 Town Hall Plaza
Clifton Park, NY 12065
Hours: Monday - Friday: 9:00am - 5:00pm